Kohesio: discover EU projects in your region



1 - 15 of 843

Access and pedestrian mobility in the central area of Constanta

  • Topic image of TO07 Network infrastructure in transport and energy
  • Flag of RO 17 970 952,00 € Total budget
  • Oct 2014 - Dec 2023

Resystematisation of transport infrastructure at Focsani level in order to increase the attractiveness and accessibility of public transport, cycling and pedestrian travel

  • Topic image of TO07 Network infrastructure in transport and energy
  • Flag of RO 14 685 086,40 € Total budget
  • Apr 2016 - Dec 2023

Modernisation of street infrastructure for access between the central area and Ocna Dej – Streets: Mihai Viteazu, Miners, Blues, Tibles, Heroes, Pintic

  • Topic image of TO07 Network infrastructure in transport and energy
  • Flag of RO 8 428 719,20 € Total budget
  • Aug 2015 - Dec 2021

Improving urban mobility and reducing CO2 emissions in Bailesti

  • Topic image of TO07 Network infrastructure in transport and energy
  • Flag of RO 11 297 505,00 € Total budget
  • Sep 2017 - Dec 2023

Supporting sustainable urban mobility at the level of Mangalia, Constanta county

  • Topic image of TO07 Network infrastructure in transport and energy
  • Flag of RO 8 447 609,60 € Total budget
  • Aug 2019 - Dec 2023

Modernisation of the integrated urban mobility corridor represented by str. Unirii, str. Dobrogeanu Gherea, str. Ecaterina Teodoroiu, str. Avram Iancu, Str. George Cosbuc, str. Queen Mary, str. Mircea the Elder, str. Marasesti (between Mircea the Elder and Gh.Sincai), str. Gheorghe Sincai, Str. 1 May (between Str. George Cosbuc and Str. I.P. Reteganul), str. The grove

  • Topic image of TO07 Network infrastructure in transport and energy
  • Flag of RO 5 852 134,01 € Total budget
  • Aug 2015 - Dec 2023

Improving the quality of life in the city of Gura Humorului, Suceava county

  • Topic image of TO07 Network infrastructure in transport and energy
  • Flag of RO 4 657 500,00 € Total budget
  • Oct 2019 - Dec 2023

Bike time – Construction of foot and bicycle paths in the Opole Agglomeration

  • Topic image of TO04 Low-carbon economy
  • Flag of PL 9 561 121,00 € Total budget
  • Apr 2018 - Nov 2023

Designing lanes dedicated to public transport in Brasov and adjacent sidewalks

  • Topic image of TO04 Low-carbon economy
  • Flag of RO 3 327 188,00 € Total budget
  • Jan 2020 - Dec 2025

Modernisation of the integrated urban mobility corridor in the center area of Turda

  • Topic image of TO07 Network infrastructure in transport and energy
  • Flag of RO 6 661 984,63 € Total budget
  • Nov 2016 - Dec 2023
1 - 15 of 843