Kohesio: discover EU projects in your region

   
more info
Start date: 23 December 2015
End date: 29 December 2023
Number of projects: 54
Total budget: 863 202 655,33 €
EU contribution: 531 131 331,27 €
Website: n/a
Country:
funds
Other funds: 531 131 331,27 €

1 - 15 of 54
PROJECTTOTAL BUDGETEU CONTRIBUTIONFUNDConstruction of the flood protection system of Felső-Tisza, Tisza-Túr reservoir 101 481 461,55 € 86 259 242,31 € n/a Tisza Wave Square: Improvement of the water transport capacity of the large water bed on the section between the Szolnok railway bridge and Kisköre 51 173 897,70 € 43 497 813,05 € n/a Complex, sustainable rehabilitation of Lake Velence coastal wall 39 568 108,45 € 33 624 978,56 € n/a Construction of flood protection lines to a significant flood level, reducing the load of defense lines on the section above the Tivadari bridge in Upper Tisza 38 483 523,27 € 32 710 994,78 € n/a Restoration of immunity on the I. Flood Protection Main Defense Lines 32 823 614,59 € 27 900 072,40 € n/a Construction of flood protection lines to significant flood levels, reducing the load of defense lines in Central Tisza in the operational area of the Central Tisza Water Directorate 25 413 118,16 € 21 601 150,43 € n/a Development and reconstruction of inland waterways II. 24 056 991,23 € 20 448 442,54 € n/a Dredging, construction and reconstruction of the Danube branch of Ráckeve (Soroksári) 20 919 932,31 € 17 781 942,46 € n/a Rehabilitation of the estuarine section of Mosoni-Duna 40 189 075,98 € 17 080 357,29 € n/a Construction of flood protection lines to standard flood levels, reducing the load of defense lines Upper Tisza, Tivadari Bridge and its surroundings 19 788 934,59 € 16 820 594,40 € n/a Remediation of Szekszárd, Lőtér water base 17 951 450,00 € 15 258 732,50 € n/a Development and reconstruction of inland waterways 17 020 164,60 € 14 467 139,91 € n/a Reconstruction of Tisalök water staircase and lock 15 825 034,92 € 13 451 279,68 € n/a Preventive measures to address water quality problems affecting Lake Balaton in the long term 14 576 662,21 € 12 390 162,88 € n/a Implementation of monitoring tests and necessary developments in accordance with the requirements of the Water Framework Directive, as well as the construction and development of monitoring stations related to the implementation of the Water Framework Directive 13 569 600,00 € 11 534 160,00 € n/a