Kohesio: skopri proġetti tal-UE fir-reġjun tiegħek

informazzjoni dwar il-proġett
Data tal-bidu: 28 Frar 2019
Data tat-tmiem: 27 Mejju 2020
finanzjament
Fond: Fond Ewropew għall-Iżvilupp Reġjonali (ERDF)
Baġit totali: 955 704,38 €
Kontribuzzjoni tal-UE: 812 348,73 € (85%)
programm
Perjodu ta’ programmazzjoni: 2014-2021
Awtorità ta’ ġestjoni: FM

Titjib tal-effiċjenza enerġetika fil-bini f’Mazā Lubānas iela 11, Riga

L-għan tal-proġett huwa li jippromwovi t-titjib tal-effiċjenza enerġetika fil-bini tal-Università tal-Latvja, Mazā Lubānas iela 11, Riga.1) l-iffrankar tal-enerġija termali ppjanat wara l-implimentazzjoni tal-proġett ma jkunx inqas minn 294.63 MWh/sena (40.27 %/sena); 2) Il-konsum ippjanat tas-sħana għat-tisħin wara l-implimentazzjoni tal-proġett mhux se jaqbeż il-51.18 kWh/m² fis-sena; 3) it-tnaqqis ippjanat tal-emissjonijiet tas-CO2 87 024 kg/sena; L-ispejjeż totali eliġibbli tal-proġett EUR 955 704.38, inklużi l-appoġġ tal-Fond Ewropew għall-Iżvilupp Reġjonali 85 % jew EUR 812 348.72 u l-finanzjament tal-baġit tal-Istat 15 % jew EUR 143 355.66.F’konformità mal-verifika tal-enerġija u l-ispezzjoni teknika tal-bini, huwa ppjanat li jiġu implimentati l-miżuri ta’ titjib tal-effiċjenza fl-enerġija li ġejjin fil-kostruzzjonijiet building:1.Based:-Insulazzjoni tal-faċċata bl-użu tal-approċċ tad-dar; — Sostituzzjoni ta ‘mili interlock;-Insulazzjoni ta ‘palazzi briks; —L-iżolament tat-twieqi minn barra tul il-perimetru, inkluż taħt it-twieqi tat-twieqi (fejn huwa fiżikament possibbli); — Is-sostituzzjoni tat-tieqa tal-kantina tal-Veco bi twieqi tal-PVC b’pakkett tal-ħġieġ b’mod selettiv. Replacement of old doors against fireproof insulated metal doors;-Cokola insulation;-Jump insulation;- Dismantling of balconies that will prevent their connection to thermal bridges.2.Hot water system:-Installation of solar collectors for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Installed shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water production (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Instalating shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installation of shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installation of shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installing shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installing shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage 15 months from the signing of the agreement on project implementation.

Flag of Latvja  Riga, Latvja