L-għan tal-proġett huwa li jippromwovi t-titjib tal-effiċjenza enerġetika fil-bini tal-Università tal-Latvja, Mazā Lubānas iela 11, Riga.1) l-iffrankar tal-enerġija termali ppjanat wara l-implimentazzjoni tal-proġett ma jkunx inqas minn 294.63 MWh/sena (40.27 %/sena); 2) Il-konsum ippjanat tas-sħana għat-tisħin wara l-implimentazzjoni tal-proġett mhux se jaqbeż il-51.18 kWh/m² fis-sena; 3) it-tnaqqis ippjanat tal-emissjonijiet tas-CO2 87 024 kg/sena; L-ispejjeż totali eliġibbli tal-proġett EUR 955 704.38, inklużi l-appoġġ tal-Fond Ewropew għall-Iżvilupp Reġjonali 85 % jew EUR 812 348.72 u l-finanzjament tal-baġit tal-Istat 15 % jew EUR 143 355.66.F’konformità mal-verifika tal-enerġija u l-ispezzjoni teknika tal-bini, huwa ppjanat li jiġu implimentati l-miżuri ta’ titjib tal-effiċjenza fl-enerġija li ġejjin fil-kostruzzjonijiet building:1.Based:-Insulazzjoni tal-faċċata bl-użu tal-approċċ tad-dar; — Sostituzzjoni ta ‘mili interlock;-Insulazzjoni ta ‘palazzi briks; —L-iżolament tat-twieqi minn barra tul il-perimetru, inkluż taħt it-twieqi tat-twieqi (fejn huwa fiżikament possibbli); — Is-sostituzzjoni tat-tieqa tal-kantina tal-Veco bi twieqi tal-PVC b’pakkett tal-ħġieġ b’mod selettiv. Replacement of old doors against fireproof insulated metal doors;-Cokola insulation;-Jump insulation;- Dismantling of balconies that will prevent their connection to thermal bridges.2.Hot water system:-Installation of solar collectors for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Installed shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water production (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Instalating shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installation of shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installation of shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installing shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installing shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage 15 months from the signing of the agreement on project implementation.