Kohesio: skopri proġetti tal-UE fir-reġjun tiegħek

informazzjoni dwar il-proġett
Data tal-bidu: 4 Novembru 2019
Data tat-tmiem: 3 Jannar 2021
finanzjament
Fond: Fond Ewropew għall-Iżvilupp Reġjonali (ERDF)
Baġit totali: 1 033 694,18 €
Kontribuzzjoni tal-UE: 878 640,05 € (85%)
programm
Perjodu ta’ programmazzjoni: 2014-2021
Awtorità ta’ ġestjoni: FM

Titjib fl-Effiċjenza fl-Enerġija fit-Triq Bullu tal-Bini 5, Riga

L-għan tal-proġett huwa li jippromwovi titjib fl-effiċjenza enerġetika fil-bini tal-Università tal-Latvja, Bullu Street 5, Riga.1) l-iffrankar tal-enerġija termali ppjanat wara l-implimentazzjoni tal-proġett ma jkunx inqas minn 286.236 MWh/sena (41.04 %/sena); 2) il-konsum tas-sħana ppjanat għat-tisħin wara l-implimentazzjoni tal-proġett mhux se jaqbeż is-27.0 kWh/m² fis-sena (il-ħtieġa tal-enerġija reali għat-temperaturi interni tinkludi wkoll fluss sinifikanti tas-sħana mis-sistema tal-misħun).3) It-tnaqqis ippjanat tal-emissjonijiet tas-CO2 ta’ mill-inqas 84 806 kg/sena.Skont l-ispejjeż totali eliġibbli tal-proġett EUR 1 033 694.18, inkluż il-Fond Ewropew għall-Iżvilupp Reġjonali jappoġġja 85 % jew EUR 878 640,05 u l-baġit tal-Istat li jiffinanzja 15 % jew EUR 155 054,13.Skont il-verifika tal-enerġija u l-ispezzjoni teknika tal-bini, huwa ppjanat li jiġi implimentat it-titjib fl-effiċjenza fl-enerġija measures:1.Basic —Sostituzzjoni ta’ mili intermedju b’filler tas-suf minerali ġdid;- Insulazzjoni ta’ qtar ta’ briks ħomor;- Insulazzjoni ta’ twieqi minn barra permezz tal-perimetru, inkluż taħt it-tagħbijiet (fejn ikun fiżikament possibbli), u b’hekk jiġu eliminati pontijiet termali;-Formulazzjoni ta’ twieqi taċ-ċelloli qodma bit-twieqi tal-PVC b’pakkett tal-ħġieġ b’ħġieġ selettiv u s-sostituzzjoni ta’ bibien qodma kontra t-twieqi tan-nar għall-iżolament tal-bibien tal-metall;-Club-Machate-coaching.Tisħin bil-club-Club b’pakkett tal-ħġieġ bi ħġieġ selettiv u s-sostituzzjoni ta’ bibien qodma kontra t-tieqa tan-nar għal bibien tal-metall iżolati; -Sistema ta’ tisħin bil-qalba tal-vakwu bit-twieqi tal-PVC b’pakkett tal-ħġieġ bi ħġieġ selettiv u s-sostituzzjoni ta’ bibien qodma kontra l-bieb tan-nar għal bibien tal-metall iżolati; Foam-club insulation;-Club-club on the water-club with a glass package with selective glass and replacement of old doors for two-windows for thermal insulation;-Club-make on the water-club.Club-Plub heating with glass package with selective glazing and replacement of the old doors against the double-windows for thermal insulation;-Bludow-coat-machine heating system with PVC windows with a selective glazing and replacement of old doors against fire-windows for insulated metal doors;-Power-machine heating system with solar heating with glass windows with selective glazing and replacement of old doors against fire-windows for insulating metal doors;-Adow-clubs on the outside of the heating panel with the outdoor panel with PVC windows incl. under the loads (where it is physically possible), thus eliminating the thermal bridges of the heating system;-Changing of the heating to the water-set with the water-cluminant windows with a glass package with a selective glazing and changing the old doors against the double-windows for heating the heating with the plug-to-boat with the water-clubs.Cludating the water-club with a glass package with selective glazing and replacement of the old doors from the windows with the double-windows.Blubable for heating with the plug-boats.Blub-club-club-club on the outside of the heating system with PVC windows, incl. under the light bulbs (where it is physically possible), eliminating the thermal bridges;-Crotating the heating with the water-clubs.Alsuit with the outdoor panel with PVC windows with a selective glazing (where it is physically possible), thus eliminating the thermal bridges;-Adating the heating-foot-footlight with the old cellar with PVC windows.Alsuite to the installation with a selective glazing (where it is physically possible), eliminating the thermal bridges from the heating system;-Viking-club against the mock-boat.Changing the heating of the outdoor panel with PVC windows, incl. under the loads (where it is physically possible), eliminating the thermal bridges with the heating panels;-Admiting the windows from the outside through the PVC windows, incl. under the loads (where it is physically possible), eliminating the thermal bridges with the heating-clubs;-Viking-foot-club with the replacement of the old cellar with PVC windows with a glass package with a selective glazing and replacement of the old doors against the light-windows for the heating-foam against the heating-foam against the water-foaming.Curve the heating with PVC windows with a glass package and replacement of the old doors 14 months from the signing of the agreement on project implementation.

Flag of Latvja  Riga, Latvja