Cilj projekta je promicanje poboljšanja energetske učinkovitosti u zgradi Sveučilišta u Latviji, Bullu Street 5, Riga.1) planirane uštede toplinske energije nakon provedbe projekta nisu manje od 286,236 MWh godišnje (41,04 % godišnje); 2) planirana potrošnja topline za grijanje nakon provedbe projekta neće prelaziti 27,0 kWh/m² godišnje (stvarna potreba za energijom za unutarnje temperature uključuje i značajan protok topline iz sustava tople vode).3) Planirano smanjenje emisija CO2 za najmanje 84 806 kg/godišnje.Projekt ukupni prihvatljivi troškovi 1 033 694,18 EUR, uključujući potporu Europskog fonda za regionalni razvoj 85 % ili 878 640,05 EUR i financiranje državnog proračuna 15 % ili 155 054,13 EUR.U skladu s energetskim pregledom i tehničkim pregledom zgrade, planira se provedba sljedećih poboljšanja energetske učinkovitosti measures:1.Basic strukture:- Izolacija fasada prema pristupu kuće; —Zamjena međuispunjâ novim punilom od mineralne vune;- Izolacija kapljica crvene opeke;- Izolacija prozora izvana kroz obodu, uključujući pod opterećenjem (gdje je to fizički moguće), čime se uklanjaju toplinski mostovi;-klaster-moulding;-Vooling starih ćelijskih prozora s PVC prozorima sa staklenim paketom s selektivnim staklom i zamjenom starih vrata protiv protupožarnih prozora za izolacijska metalna vrata;-Club-Machate-coaching.Club-Club grijanje sa staklenim paketom sa selektivnim ostakljenjem i zamjenom starih vrata protiv protupožarnog prozora za izolirana metalna vrata;-Power-klub-pomični sustav grijanja s PVC prozorima sa staklenim paketom sa selektivnim ostakljenjem i zamjenom starih vrata protiv protupožarnih vrata za izolirana metalna vrata; Foam-club insulation;-Club-club on the water-club with a glass package with selective glass and replacement of old doors for two-windows for thermal insulation;-Club-make on the water-club.Club-Plub heating with glass package with selective glazing and replacement of the old doors against the double-windows for thermal insulation;-Bludow-coat-machine heating system with PVC windows with a selective glazing and replacement of old doors against fire-windows for insulated metal doors;-Power-machine heating system with solar heating with glass windows with selective glazing and replacement of old doors against fire-windows for insulating metal doors;-Adow-clubs on the outside of the heating panel with the outdoor panel with PVC windows incl. under the loads (where it is physically possible), thus eliminating the thermal bridges of the heating system;-Changing of the heating to the water-set with the water-cluminant windows with a glass package with a selective glazing and changing the old doors against the double-windows for heating the heating with the plug-to-boat with the water-clubs.Cludating the water-club with a glass package with selective glazing and replacement of the old doors from the windows with the double-windows.Blubable for heating with the plug-boats.Blub-club-club-club on the outside of the heating system with PVC windows, incl. under the light bulbs (where it is physically possible), eliminating the thermal bridges;-Crotating the heating with the water-clubs.Alsuit with the outdoor panel with PVC windows with a selective glazing (where it is physically possible), thus eliminating the thermal bridges;-Adating the heating-foot-footlight with the old cellar with PVC windows.Alsuite to the installation with a selective glazing (where it is physically possible), eliminating the thermal bridges from the heating system;-Viking-club against the mock-boat.Changing the heating of the outdoor panel with PVC windows, incl. under the loads (where it is physically possible), eliminating the thermal bridges with the heating panels;-Admiting the windows from the outside through the PVC windows, incl. under the loads (where it is physically possible), eliminating the thermal bridges with the heating-clubs;-Viking-foot-club with the replacement of the old cellar with PVC windows with a glass package with a selective glazing and replacement of the old doors against the light-windows for the heating-foam against the heating-foam against the water-foaming.Curve the heating with PVC windows with a glass package and replacement of the old doors 14 months from the signing of the agreement on project implementation.