The project concerns the section of ul. It has a length of approx. 0.97 km from the junction of the roundabout with ul. The Lubelski Trail to the planned “Wał Miedzeszyński” junction with the S2 expressway executed on behalf of GDDKiA. The road will have two 7 m wide roads and a 1.75 m wide lane. The end of the section is accepted in the area of the intersection with cucumber streets and rosés, which will be connected to local roads located on both sides of the street. The Miedzeszyński Wall. Along this section of the street. The Miedzeszyński shaft provides for the liquidation of individual and public conventions. The adjacent area will be handled via access roads parallel to the main road. Access roads were connected to the main route through two intersections with traffic signals from the street. Wired and cucumber. The intersection of the street. The Lubelski Trail was designed as a turbine roundabout. The roads will have a cross-section with drainage through drainage to the designed rainwater drainage system. Pedestrian traffic will take place on both sides of the 2.0 m wide walkways located on local roads, while cycling will be carried out on separate cycle paths and local roads on general principles. In order to link the extended section of the road with the existing and planned layout of public roads, intersections were designed: — km 0 + 027,54 – str. Lubelski Trail – single-level intersection, turbine roundabout – km 0 + 078.26 – local road west – departure from ul. Miedzeszyński Wall – km 0 + 081.04 – Eastern local road – entrance to ul. Miedzeszyński Wall – km 0 + 353.83 – Eastern local road – departure from ul. Miedzeszyński Wall – km 0 + 392,73 – ul. Wired intersection with light signalling – km 0 + 489.77 – Connection – local road No 4 – entrance to ul. Miedzeszyński Wall – km 0 + 686,06 – ul. Cucumber – intersection with light signals.