Kohesio: discover EU projects in your region

project info
Start date: 1 July 2022
End date: 1 March 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 700 000,00 €
EU contribution: 396 550,00 € (56,65%)
programme
Programming period: 2014-2021
Managing authority: Subdirección General de Gestión del FEDER, de la Dirección General de Fondos Europeos del Ministerio de Hacienda.

IMPLEMENTATION OF MEASURES DERIVED FROM A NEW COMPREHENSIVE PLAN FOR SUSTAINABLE URBAN MOBILITY

It consists of the execution of a pedestrian walk and bicycles that allows to connect the Isla de los García (place located on the right bank of the river) with the industrial area “Estela II” and with the Parque de los Cerros, environment located on the opposite margin of the river Henares. For this purpose, the construction of a footbridge on the Henares River is proposed._x000D_ The proposed works include the construction of:_x000D_ • A pedestrian walkway on the grounds of the right bank of the river of 750 m²_x000D_ • A pedestrian walkway on the 200 m²_x000D_ • A pedestrian walk on the grounds of the left bank of the river of 760 m²

Flag of Spain  Spain