The building is located on line No. 290 Olomouc — Šumperk, in the section Uničov (including) — Olomouc. The construction is followed by two other constructions on the same line in the connecting section of Uničov — Šumperk: Electrification and Capacity of the line Libina — Uničov and Electricisation and Capacity of the line Šumperk — Libina. The object of the construction is the electrification of the line by the DC traction system (DC 3 kV), including the increase of speed up to v=160 km/h. At the same time, these will require a comprehensive optimisation of the elements of the railway infrastructure.