Kohesio: discover EU projects in your region

project info
Start date: 22 March 2017
End date: 28 February 2022
funding
Fund: n/a
Total budget: 35 384 863,29 €
EU contribution: n/a
programme
Programming period: 2014-2020
Managing authority: Nemzeti Fejlesztési Minisztérium, Környezetvédelmi és Energiahatékonysági Programokért Felelős Helyettes Államtitkárság
European Commission Topic
European Commission Topic

Water retention and landscape change planning in the Ancient-Dráva Program

The aim of the development is to improve the infrastructure conditions for sustainable water management in the area planned in the Ancient-Dráva Programme, in order to implement a water management system that supports water retention, water resource conservation and the quantitative and qualitative protection of water, taking into account landscape change and ecological aspects. Based on the assessed and prospective water needs and available water resources, we plan to implement the following water management interventions in the region: — Refurbishment and construction of beds and other water facilities for inland water protection and local water damage control. Implementation of in situ interventions to improve the water governance of drainage systems in accordance with each other. — The establishment of reservoirs and reservoirs for the summer drought period. — Establishment of water steering systems to ensure the distribution and transfer of available surface water resources. — Construction of dams, refurbishment and construction of side works. — Creating the possibility of water restocking of dead branches, side branches and other water spaces. — Refurbishment of pumped water outlets (irrigation locks), establishment of pump stations. Improve the functionality of existing operational ditches by installing mobile pump stations. — Implementation of deep-area water retention opportunities. Major planned technical interventions(to be specified in the planning): • Reservoirs: 2 large, 6 smaller, plus storage. • Construction of new bed sections: 16 km, construction of a closed channel 950 m. • dredging: 56 km, Maintenance band, crown stabilisation: 11 km. • Construction of small structures (greater dam, dam, water-governance structure, lock-out and central artefacts, side works) 51 pcs. • Gauge for water transfer: 11 pcs. Water flow metering artifact: 1 pcs. • Renovation of existing side works: 62 pcs. • Build Pump Jobs: 6 pcs. • Built-in pump: 1 pcs. • Charging confirmation: 2.2 km in length. • Water restocking of wetlands, dead branches: 10 pcs. Revitalisation of branches: 6 pcs.

Flag of Hungary  Somogy, Hungary