Kohesio: faigh amach faoi thionscadail de chuid an Aontais i do réigiúnsa

eolas faoin tionscadal
Dáta tosaigh: 4 Samhain 2019
Dáta deiridh: 3 Eanáir 2021
maoiniú
Ciste: undefined (ERDF)
Buiséad iomlán: 1 033 694,18 €
Ranníocaíocht an Aontais: 878 640,05 € (85%)
chlár
Clárthréimhse: 2014-2021
An tÚdarás bainistíochta: FM
réimhse idirghabhála
neamhbhainteach

Feabhas ar Éifeachtúlacht Fuinnimh i bhFoirgneamh Sráid Bullu 5, Ríge

Is é is aidhm don tionscadal feabhsú éifeachtúlachta fuinnimh a chur chun cinn i bhfoirgneamh Ollscoil na Laitvia, Sráid Bullu 5, Ríge.1) nach lú ná 286.236 MWh in aghaidh na bliana (41.04 %/bliain) an coigilteas fuinnimh theirmigh atá beartaithe tar éis chur chun feidhme an tionscadail; 2) an tomhaltas teasa atá beartaithe le haghaidh téimh tar éis chur i bhfeidhm an tionscadail, ní rachaidh sé thar 27.0 kWh/m² in aghaidh na bliana (áirítear sreabhadh suntasach teasa ón gcóras uisce te san fhíor-ghá fuinnimh le haghaidh teochtaí laistigh freisin).3) An laghdú beartaithe ar astaíochtaí CO2 84 806 kg in aghaidh na bliana ar a laghad.Tá sé beartaithe costais incháilithe iomlána EUR 1 033 694.18 a chur i bhfeidhm, lena n-áirítear tacaíocht ó Chiste Forbraíochta Réigiúnaí na hEorpa le 85 % nó EUR 878 640,05 agus maoiniú buiséid stáit 15 % nó EUR 155 054,13.I gcomhréir le hiniúchadh fuinnimh agus cigireacht theicniúil an fhoirgnimh, tá sé beartaithe na struchtúir feabhsúcháin éifeachtúlachta fuinnimh seo a leanas a chur i bhfeidhm:-Fascáidí a insliú ag baint úsáide as cur chuige an tí; —Athsholáthar líonadh idirmheánach le líontóir olann mianraí nua;- Insliú braoiníní bríce dearga;- Insliú fuinneoga ón taobh amuigh tríd an imlíne, lena n-áirítear faoi na hualaí (nuair is féidir go fisiciúil), rud a chuireann deireadh le droichid theirmeacha; — Múnlú na seanfhuinneoga cille le fuinneoga PVC le pacáiste gloine roghnach agus athsholáthar doirse d’aois in aghaidh na fuinneoga dóiteáin le haghaidh doirse miotail inslithe; Club-Club-cóitseáil.Club-Club teasa le pacáiste gloine le gloiniú roghnaíoch agus athsholáthar doirse d’aois i gcoinne dóiteáin-fuinneog do dhoirse miotail inslithe;-Cumhacht-club-athrú córas teasa le PVC fuinneoga le pacáiste gloine le gloiniú roghnach agus athsholáthar doirse d’aois i gcoinne tine-doras do dhoirse miotail inslithe; Foam-club insulation;-Club-club on the water-club with a glass package with selective glass and replacement of old doors for two-windows for thermal insulation;-Club-make on the water-club.Club-Plub heating with glass package with selective glazing and replacement of the old doors against the double-windows for thermal insulation;-Bludow-coat-machine heating system with PVC windows with a selective glazing and replacement of old doors against fire-windows for insulated metal doors;-Power-machine heating system with solar heating with glass windows with selective glazing and replacement of old doors against fire-windows for insulating metal doors;-Adow-clubs on the outside of the heating panel with the outdoor panel with PVC windows incl. under the loads (where it is physically possible), thus eliminating the thermal bridges of the heating system;-Changing of the heating to the water-set with the water-cluminant windows with a glass package with a selective glazing and changing the old doors against the double-windows for heating the heating with the plug-to-boat with the water-clubs.Cludating the water-club with a glass package with selective glazing and replacement of the old doors from the windows with the double-windows.Blubable for heating with the plug-boats.Blub-club-club-club on the outside of the heating system with PVC windows, incl. under the light bulbs (where it is physically possible), eliminating the thermal bridges;-Crotating the heating with the water-clubs.Alsuit with the outdoor panel with PVC windows with a selective glazing (where it is physically possible), thus eliminating the thermal bridges;-Adating the heating-foot-footlight with the old cellar with PVC windows.Alsuite to the installation with a selective glazing (where it is physically possible), eliminating the thermal bridges from the heating system;-Viking-club against the mock-boat.Changing the heating of the outdoor panel with PVC windows, incl. under the loads (where it is physically possible), eliminating the thermal bridges with the heating panels;-Admiting the windows from the outside through the PVC windows, incl. under the loads (where it is physically possible), eliminating the thermal bridges with the heating-clubs;-Viking-foot-club with the replacement of the old cellar with PVC windows with a glass package with a selective glazing and replacement of the old doors against the light-windows for the heating-foam against the heating-foam against the water-foaming.Curve the heating with PVC windows with a glass package and replacement of the old doors 14 months from the signing of the agreement on project implementation.

Flag of an Laitvia  Ríge, an Laitvia