As part of the project, a reconstruction of the street was planned. Chopin from the intersection of al. The 500th anniversary of Toruń to the junction with St. John Paul II, reconstruction of St. John Paul from the J. Piłsudski Bridge to the Independence Square along with the square and street. It’s a gene shaft. Sikorski from Pl. Polish Artillery to the intersection with al. Solidarity without this intersection. In addition, the construction of a short section of the track was designed in a street. Kraszewskiego and St. The Red Road. As part of this investment, the construction of roads with bituminous and stone pavements, the construction of pavements, bicycle paths, exits and 7 tram platforms, as well as crossings and crossings were planned. In the hive. Chopin, St. John Paul II and further on in St. Kraszewskiego and ul. The red road track is planned to be separated from the road. In the hive. It’s a gene shaft. Sikorski track was designed as integrated with the road in the middle of its cross section. The total length of the designed track is 2 + 748.989 meters of single track.There are plans to reconstruct the existing traffic lights and to build a traffic signal generated by the tram on all tram crossings and crossing the track. Construction of traffic lights is planned at the junctions of St. John Paul II with streets: Frederic Chopin, Wal Gene. Sikorski and the Red Road/Józef Kraszewski.