Kohesio: discover EU projects in your region

project info
Start date: 23 November 2016
End date: 31 May 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 7 016 108,01 €
EU contribution: 5 963 691,81 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Dolnośląskiego obsługiwany przez Urząd Marszałkowski

“Construction of the Voivodeship Road No. 451 – the eastern ring road of Oleśnica”

The object of the investment is the construction of the 451-East Oleśnica ring road and the strengthening of the existing road from the junction of the design DW 451 from Warsaw Street towards the S8 junction.The projected section of the Voivodeship Road No.451 is designed to connect the existing DW 451 with the former DK8 to form the eastern bypass of the town Oleśnica.The purpose of the investment is to relieve the load on the transit traffic S-8. In addition, the entire section of the road will be followed by a new trail, with the exception of the reinforcement section of the existing pavement road with new layers and on the construction of the provincial side from the junction at Warszawska Street towards the S8 junction (Olesnica-Pół node) with the introduction of technical parameters compatible with the adopted class G road and ensuring the necessary level of road safety. As part of the investment, four intersections with DW 451 have been designed.The investment is located in the vicinity of the areas intended for production and service construction and in the areas of crop fields, meadows and forests.The investment also runs through the area of a non-functioning military airport and crosses the existing railway line on which the existing railway crossing should be rebuilt. Results of the task: length of reconstructed roads-1.28 km; length of built voivodship roads-2.75 km; length of reconstructed municipal roads-0.05 km; length of reconstructed district roads- 0.72 km;total length of rebuilt roads-2,05 km;total length of built roads-2.75 km;number of built bypasses-1szt. The project will be implemented in the “design/build” formula from Ikw.2016 to IVkw.2020r. The applicant has technical and personnel facilities to carry out and settle the investment, and then to maintain it during the shelf life.The chosen option for carrying out the task and technological solutions has been defined in the PFU. Accompanying infrastructure – under ‘Other information’.

Flag of Poland  Wrocławski, Poland