The project includes the construction of three sections of the tram route to Wilanów. Two sections within Rakowiecka Street – Puławska – Goworka – Walk – Belwederska – Sobieskiego – al. Rzeczpospolita (including the construction of relevant frontal terminals) and the third section within ul. The Battle of Warsaw 1920 on the section from ul. Grójecka to the Western Railway Station with a total length of approx. It’s 11,70 miles. The final length of the route will be determined on the basis of the design documentation.