The main part of the project is the extension of the section of national road No. 81 (ul. Kościuszki) with a length of 1.44 km along with the construction of a two-storey “Karo” type WB at the junction with Armii Krajowa Street with a two-lane turbine roundabout, which forms through DK 86 access to the A4 motorway.