Kohesio: discover EU projects in your region

project info
Start date: 1 January 2014
End date: 31 January 2021
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 21 809 668,65 €
EU contribution: 18 538 218,36 € (85%)
programme
Programming period: 2014-2021
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego
beneficiary

Construction of a section of the road from ul. Daszyńskiego to ul. Rybnicka in Gliwice – the western part of the city bypass

The scope of the project includes the construction of the western Gliwice ring road from Daszyńskiego Street to ul. Of which: —the construction of the road from St. Daszyńskiego to ul. It has a length of approx. 3.2 km – The first stage of the western bypass of the city – crossroads of links with ul. Rybnicka, – construction of road junctions with Rybnicka Street – extension of ul. In the area of the junction and road junction with the A4 at the length of approx. 0.6 km – reconstruction of transverse roads: ul. Orkana and St. Wójtowska – construction of service and economic roads with a total length of approx. 7,49 km – construction of intersections: — construction of foot-bike lines; —construction of sidewalks and bicycle paths; —construction of a bay for inspection services; —construction of two bays – car scales; —construction and reconstruction of individual slides; — construction of bridge structures: Bridge over the stream Ostropka – km 0+ 034, Estakada over the Doa stream – km 1+ 635; — construction of acoustic screens; — construction of road culverts under cross roads and maintenance and economy; — construction of culverts under exits; — construction of passages for small animals; — construction of street lighting; — construction of infrastructure to drain the road; —construction of retention tanks – refurbishment of technical infrastructure which conflicts with the intention of construction; — construction of traffic safety devices, i.e. protective barriers, vertical and horizontal marking; —light signalling; —producing tables of variable content, preselected scales, meteorological stations, cameras; —producing green plantings; —cutting of trees; — demolition of buildings; —development of fences – extension of the ITS system and integration of the ring road into the ITS in the city

Flag of Poland  Gliwicki, Poland