The project consists of the construction of the S6 expressway on the Goleniów-Kiełpino section with a total length of 54.49 km located in the TEN-T network. This project consists of three sections (contracts): • Episode 1: Design and construction of the S-6 road at the Goleniów – Nowogard section (S-3, Goleniów North node/with node/- the beginning of the Nowogard ring road); right road from km 21 + 390.00 to km 40+ 911.37, left road from km 22+ 300.00 to km 40 + 37.2, • Section 2: Design and construction of the S-6 road at the section Nowogard – Płoty (the end of the ring road of Nowogard – end of the Płoty ring road); from km 49 + 098.00 to km 69 + 460.56, • Section 3 – Design and construction of the S-6 road at the end of the ring road m. Płoty – knot Kiełpino; from km 69 + 400.002 to km 84 + 014,48. (The end of section 2 in km 69 + 460.53 is the same as the beginning of section 3 in km 69 + 400.00).