The aim of the project is to organise water management in the Kiedrzyn district in Częstochowa and its proper management. Scope The investment includes the construction of a pipe rain manifold, an open rain manifold – a ditch, a storage tank and a technological route. Within the framework of the project, the rain collector from reinforced concrete pipes will be closed. 1363 m., open manifold in the form of a ditch with a length of 576.03 m, storage tank with a capacity of approx. 9000 m³, emergency transfer with a total length of approx. 121.2 m and an open ditch with a length of 110.7 m. To facilitate access to the ditch and the reservoir, it is planned to build technological roads with a total length of 1025.16 m and a width of 3 m. The project plans to clean up wastewater in the form of rain chambers located along the rain canal route, equipped with settlers and a system of five separators. The project also involves rebuilding and securing existing earth cable lines, waterworks and sanitary sewers in order to avoid collisions with the design and planting of deciduous trees and sowing the affected area with a mixture of lawn.