Kohesio: discover EU projects in your region

project info
Start date: 19 October 2022
End date: 31 December 2023
funding
Fund: Cohesion Fund (CF)
Total budget: 940 586,00 €
EU contribution: 799 498,10 € (85%)
programme
Programming period: 2014-2021
Managing authority: Ministerul Dezvoltarii Regionale, Administratiei Publice si Fondurilor Europene
intervention field

Photovoltaic panels for the production of energy from renewable sources at the level of the water and wastewater infrastructure of the regional operator Water Company Arad SA

The overall objective is to improve energy efficiency by using renewable energy for own consumption at the level of Arad Water Company. Objectives expected to be achieved following the implementation of the project: Water Plant II: O Gross primary energy production 46.20 t.e.p/year from renewable sources; total net electricity generation of 10 152.28 MWh over a period of 20 years; O Reduction of greenhouse gases by: 3.350.25 tonnes of CO2 equivalent/year over a period of 20 years; O Providing a share of self-consumption (directly and indirectly, by offsetting the amount of electricity injected into the SEN) of: 537.16 MWh/year (12.29 %) in the first year of operation. Wastewater treatment plant Arad: O Gross primary energy production 46.47 t.e.p/year from renewable sources; total net electricity generation of 10 211.92 MWh over a period of 20 years; O Reduction of greenhouse gases by: 3.369.94 tonnes of CO2 equivalent/year over a period of 20 years; O Providing a share of self-consumption (directly and indirectly, by offsetting the amount of electricity injected into the SEN) of: 540.31 MWh/year (14.49 %) in the first year of operation. The project’s output indicators will consist of: • Newly installed renewable energy generation capacity: 799.5 kWp. • Greenhouse gas reduction: 336,01 tonnes CO2 equivalent/year

Flag of Romania  Bucureşti, Romania