The overall objective is to improve energy efficiency by using renewable energy for own consumption at the level of Arad Water Company. Objectives expected to be achieved following the implementation of the project: Water Plant II: O Gross primary energy production 46.20 t.e.p/year from renewable sources; total net electricity generation of 10 152.28 MWh over a period of 20 years; O Reduction of greenhouse gases by: 3.350.25 tonnes of CO2 equivalent/year over a period of 20 years; O Providing a share of self-consumption (directly and indirectly, by offsetting the amount of electricity injected into the SEN) of: 537.16 MWh/year (12.29 %) in the first year of operation. Wastewater treatment plant Arad: O Gross primary energy production 46.47 t.e.p/year from renewable sources; total net electricity generation of 10 211.92 MWh over a period of 20 years; O Reduction of greenhouse gases by: 3.369.94 tonnes of CO2 equivalent/year over a period of 20 years; O Providing a share of self-consumption (directly and indirectly, by offsetting the amount of electricity injected into the SEN) of: 540.31 MWh/year (14.49 %) in the first year of operation. The project’s output indicators will consist of: • Newly installed renewable energy generation capacity: 799.5 kWp. • Greenhouse gas reduction: 336,01 tonnes CO2 equivalent/year