Kohesio: discover EU projects in your region

project info
Start date: 1 February 2019
End date: 30 June 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 437 733,66 €
EU contribution: 317 733,66 € (72,59%)
programme
Programming period: 2014-2021
Managing authority: Collectivité territoriale de Martinique
intervention field
beneficiary

Implementation of a new centrifuge, replacement of the automatic defroster and supply of two vent turbines to the Dillon sewage treatment plant

The STEP de Dillon is responsible for the treatment of wastewater from urban effluents in the commune of Fort-de-France. The concentration of liquid sludge during treatment is within a range of 15-25 g/l, depending on the operator’s data. The current centrifuge room houses two centrifuges installed on concrete plots to manage two sludge treatment systems simultaneously. This project is part of the improvement of wastewater treatment by the Dillon wastewater treatment plant. The latter has two centrifuges, one of which has existed for more than 20 years and whose spare parts are becoming scarce. The project will consist of setting up a second centrifuge, sized to extract much more sludge (compared to the old one) and optimise the operation of the dehydration chain of the plant and thus improve the treatment of wastewater. As part of this project, an automatic defroster will be installed at the discharge station level of the treatment plant as well as two aeration turbines for treatment line No. 2.

Flag of France  Martinique, France