The task includes the stabilisation of landslide No. 81112 with the reconstruction of the municipal road. Forest located in the village of Muszyna. Works related to the stabilisation of the landslide include works connected with securing the slope on the right side of the road between the municipal road and the Poprad river. Stabilisation of this slope is expected to be made in the form of volleyball structures of gabions with an expedition of a height ensuring the flow of reliable water Q1. Expected scope of construction works: Execution of gabion slope protectionReconstruction of the municipal road on the section approx. 182mbReconstruction of culverts,Construction of drainage system Demolition worksSlide protection made in the form of volleystone structures from the Poprad River is aimed at improving the stability of slope slope, through such action we ensure an appropriate level of stability for the planned reconstruction of the municipal road. Such a solution also protects the slope on the terrace, which will be rebuilt the road from the negative effects of the basin waters of the Poprad River. The height of the protective structure planned for construction must be at least as high as the level of 100-year-old basal water, i.e. Q1. The improvement of the stability of the slope between the Poprad River and the municipal road is to be ensured by volleystone structures, i.e. Gabions made of welded steel mesh, filled with broken stone and flooded with concrete mortar. It is envisaged to make gabions with dimensions of 1.5x1.5 m arranged stairs to the level of min. of reliable water, in order to improve the stability of the slope slope and stability of the municipal road. Starting conditions for the design of the reconstruction of the municipal road:The technical class of the roadGoldable pressure on a single vehicle115 kNośCategory of traffic loadKR3. The project’s tasks also included the development of the necessary documentation, the work of the supervisory inspector and management and promotion.