THE INVESTMENT PROJECT INCLUDES INTERVENTIONS OF REPLACEMENT FIXTURES, ENERGY EFFICIENCY OF PLANTS, ENERGY PRODUCTION PLANTS. FIXTURES WILL BE INSTALLED WITH TRANSMITTANCE AT LEAST 1.80 W/MQK. REPLACEMENT OF THE ACS HEATING/PRODUCTION SYSTEM IS PLANNED, INSTALLING HIGH COP HEAT PUMPS. THE SAR SYSTEM IS ALSO USED FOR AIR CONDITIONING. FOR THE PRODUCTION OF DOMESTIC HOT WATER, INSTALL A SOLAR THERMAL SYSTEM, SUPPLEMENTING THE ACCUMULATIONS OF EXISTING SANITARY ACS. SOLAR THERMAL PANELS WILL BE INSTALLED TO COMPLEMENT THE ACCUMULATIONS IN THE THERMAL POWER PLANT FOR THE PRODUCTION OF THE ACS. A PHOTOVOLTAIC SYSTEM IS CREATED TO ABSORB LARGELY THE CONSUMPTION OF ELECTRICITY, MONITORED AND MANAGED BY AN ACTIVE ENERGY MONITORING SYSTEM, ABLE FROM ANYWHERE TO VISUALISE THE PRODUCTION OR FAILURE, AND TO BE ABLE TO MANAGE THE DIFFERENT ELECTRICAL UTILITIES EVEN REMOTELY.