Kohesio: discover EU projects in your region

project info
Start date: 31 January 2018
End date: 20 December 2020
Project website: link
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 62 198,56 €
EU contribution: 46 648,92 € (75%)
programme
Programming period: 2014-2021
Managing authority: Dirigente Generale pro-tempore Ufficio Autorità di Gestione dei Programmi Operativi FESR - Dipartimento Programmazione e Finanze - Regione Basilicata

ENERGY EFFICIENCY OF COMPANIES

THE CANDIDATE INTERVENTIONS ARE: 1 — EFFICIENCY OF THE LIGHTING SYSTEM, WITH REPLACEMENT OF EXTERNAL AND INTERNAL FLUORESCENT LAMPS, WITH LED TECHNOLOGY LAMPS EQUIPPED WITH PRESENCE SENSORS FOR A BUILDING AUTOMATION; 2 — OPTIMISATION OF THE ENERGY EFFICIENCY OF THE BUILDING THROUGH THE INSULATION OF THE ROOFING FLOOR WITH THE REALISATION OF AN INTERNAL COAT, MASKED BY THE EXISTING COUNTER-CEILING; 3 CONSTRUCTION OF N. 2 19.8 KW CAD PHOTOVOLTAIC SYSTEMS. FOR SELF-CONSUMPTION OF ENERGY, ONE OF WHICH IS DEDICATED TO THE HEAT PUMP; 4 REALISATION OF AN ELECTRICAL STORAGE SYSTEM FOR THE EXPLOITATION OF RENEWABLE ENERGY PRODUCED BY PV PLANTS, CONSISTING OF 3 STORAGE GROUPS USING HIGH-EFFICIENCY LITHIUM POLYMER BATTERIES WITH CAPACITIES EQUAL TO 9.6 KWH; 5 — REALISATION OF A SYSTEM OF MANAGEMENT AND MONITORING OF TOTAL ENERGY CONSUMPTION AND CONTROL ALSO OF THE PARAMETERS OF PRODUCTION OF PV PLANTS.

Flag of Italy  Province of Matera, Italy