THE PROPOSED INVESTMENT PLAN CONCERNS THE CONSTRUCTION, INSTALLATION AND COMMISSIONING OF A POWER PLANT FOR THE PRODUCTION OF ENERGY FROM RENEWABLE SOURCES, IN PARTICULAR CONSISTING OF A MINI-HYDROELECTRIC POWER PLANT, CAPABLE OF GENERATING A NOMINAL POWER OF ABOUT 120KWP. THE PLANT WILL BE BUILT IN TERRAROSSA COLOMBO, IN THE MUNICIPALITY OF MOCONESI, AT A PRE-EXISTING POINT OF CONCENTRATION OF THE WHITEBOARD STREAM (USED FOR ENERGY PRODUCTION), WHERE THERE IS A SMALL JUMP IN ALTITUDE, BUT WITH A GOOD FLOW OVER THE COURSE OF THE YEAR, CURRENTLY UNUSED AND CLUTTERED WITH SEDIMENTS. THE CONSTRUCTION OF THE PLANT WILL INVOLVE THE RENOVATION OF THE SITE, THE RESTORATION OF THE PRE-EXISTING DUCTING AND THE RELATED MECHANICAL SYSTEMS FOR THE INTERCEPTION OF WATER AND THE ELIMINATION OF SEDIMENTS AND GRAVEL, AS WELL AS THE REALISATION AND INSTALLATION EX-NOVO OF THE ELECTROMECHANICAL GENERATING UNIT AND THE RELATED CONT SYSTEMS.