The project aims to build a logistics facility for refrigerated goods traffic, cold logistics hub, in the Port of Huelva, with the use of an ecological cold from the use of the residual cold that is generated in the regasification processes of Enagás, also located in the Port. This is the construction of a self-supporting and automated refrigeration warehouse, warehouse for receiving/shipping goods, freezing tunnels and machine room, workshop and offices, with a storage capacity of 180.000 m³; industrial refrigeration equipment and high density automatic storage system.The Logistic Hub of the Frío del Puerto de Huelva is a project encompassed in a framework of collaboration between the Port Authority of Huelva, APH, and Enagás, for the use of the residual cold of the regasification process, through which cold production is achieved at temperatures up to -36 °C with a saving of more than 60 % of energy costs.On September 17, 2020, the Administrative Concession by the APH is approved to the company Frigoríficos Ports del Sur, for the construction and operation of cold stores and management of goods at controlled temperature, for a period of 35 years and an area of 32.570 m².The building consists of the following volumes: — Self-supporting and automated refrigeration warehouse (Silo). Unique building with a sup. 4 999.91 m² and height 35 m. It will house automatic warehouse, structure of 10 floors, which will be accessed through 4 pallet lifts (2 input and 2 exit), which will place in each plant the palletised merchandise.- Ship for Recep/Exped (previously silo). It will house the tilting docks of loading/unloading necessary to attend the flow of trucks, of 1 298.22 m²- Auxiliary ship composed of chamber anteroom, freezing tunnels and chamber. Nave of 3 857.85 m², which will house a cold room with a height of 8 m, 2 freezing tunnels, with capacity to freeze more than 15 tons per day.- Edif. of Offices. Edif. of 2 floors and of 478.80 m². — Room of Máq. and workshop, of 345.40 m². It will house exchangers and conventional refrigeration machinery, covering eventual absence of the main supply, capable of keeping the facilities in service, working 24 hours/day. It will also house a workshop and transformation center.In the exterior urbanisation there is a concrete esplanade for access of trucks to the loading and unloading area, personnel parking and access of vehicles for extinction and maintenance of the inst. of the engine room. The CNAE of the company is incentivable, included in Annex I of the Order for Line and Typology, CNAE 52.10 Deposit and storage, the activity is not excluded in Commission Regulation 651/2014, thus complying with note 4 of the activities included in Annex I to that Order. The company presents a report of presence of no start of work carried out on 25/01/2021. The implementation of the project will take place during the years 2021-2023, with the completion date being 30/06/2023. Analysing the projects of this company that are in processing with the Order of June 5, 2017 on Industrial Development, as well as the previous projects, within the last 3 years, and that are carried out within the same province, it is concluded that according to the definition nº 22 of Annex V of the Order, it is not necessary to adopt any kind of caution, since the total investment does not reach 50 MM of euros established to consider a project as a Large Investment Project. According to Article 20.3 of the Regulatory Order, the prior approval of the Governing Council of the Andalusian Innovation and Development Agency is necessary for the grant of this grant, since the proposed amount exceeds EUR 450.000.