Start date: 17 September 2015
End date: 31 December 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 40 860 176,00 €
EU contribution: 34 731 148,80 € (85%)
programme
Programming period: 2014-2020
Managing authority: Ministerul Dezvoltarii Regionale, Administratiei Publice si Fondurilor Europene

Construction/modernisation of six bridges on the national road network

The general objective of this project is to ensure an adequate viability status of some national roads representing high importance roads (DN1, DN10, DN13C, DN24, DN2B) through punctual construction interventions or, where appropriate, rehabilitation of bridges located on their alignment. These interventions will ensure the maintenance of adequate connectivity on the national road network in the area of incidence of investment objectives. Through the project implementation, it is intended both the modernisation/rehabilitation of existing bridges, as well as the construction of new bridges, including the infrastructure for connecting them with the existing network. The specific objectives of the project are: Building 5 new bridges, including connecting arteries to existing infrastructure and a passageway, with a total length of 5.865 km. Rehabilitation of a bridge with a length of 0.125 km. This investment objective contributes to increasing mobility and ensuring the connectivity of the region in the area of incidence of the project with neighbouring regions and will lead to the achievement of the overall objective of Priority Axis no. 2: Developing a multimodal, quality, sustainable and efficient transport system.

Flag of Romania  Multiple locations, Romania