The subject of the proposed measures is insulation of vertical perimeter structures, insulation of roofs, replacement of filling holes and overall reconstruction of lighting system. The building is located on par.353/31. The building is located in a conservation area, according to PrŽaP, meet 10 % energy savings, 10 % emission savings. The applicant assumes the use of the EPC method.We ask for an increase of own resources from the NZU programme. The project is expected to be implemented in several years (set by an estimate in the application), it will be precisely set in the ZD.