The subject of the project is the construction of the I/67 road transfer mainly in category S 11.5/80 in the total length of the main route 2.975 km, which is designed as the south-western bypass of the town of Karviná. The implementation of the project will carry out transit traffic outside the urban area and reduce the burden on the population through noise and exhalations. It will also increase traffic flow on road I/67, reduce driving time and improve road safety in Karviná, including pedestrian safety.