Kohesio: discover EU projects in your region

project info
Start date: 12 June 2021
End date: 30 June 2023
funding
Fund: Cohesion Fund (CF)
Total budget: 1 990 369,95 €
EU contribution: 1 000 000,00 € (50,24%)
programme
Programming period: 2014-2021
Managing authority: Estrutura com a natureza jurídica de estrutura de missão, criada pelo Decreto-Lei n.º 137/ 2014 de 12 de setembro
intervention field

Reformulation of the WWTP of Ponte das Tábuas

The reformulation of the TABUAS POINT WATER results from the need to address the situation at the level of the deficit treatment currently presented by the treatment plant. In this sense, the construction of an activated sludge-type treatment plant, based on SBR technology, is expected to be built under a prolonged aeration regime. The final discharge of treated waste water will take place in the receiving water environment, Rio Galinhas, a tributary of the Douro River.

Flag of Portugal  Tâmega e Sousa subregion, Portugal