The project involves the construction of a Technical School Complex (hereinafter: ZST). The investment is located in the town of Tarnowo Podgórne, plot No. 76/11, in the municipality of Tarnowo Podgórne, Poviat Poznań, voivodeship. The Greater Poland. The designed didactic building is a 3 storey building, not basemented with a flat roof and an internal courtyard. The teaching building has 18 didactic rooms, 14 professional studios, 6 rooms for self-study, a computer room as well as storage, technical and sanitary rooms. Scope of work carried out as part of the project: 1. Documentation — construction project, executive design and replacement project 2. Construction works — construction and architecture (earthwork, elevator glass foundations, reinforced concrete structures of walls, external walls, internal walls, ceilings and floors, personal elevator, stropods, window and door joinery, finishing works, ramp for disabled persons 3. Sanitary facilities 4. Electrical and teletechnical installations 5. Equipment — bike rack 6. Author’s and investor supervision 7. The above works will be carried out from 25.08.2017 to 30.08.2021. The planned tangible effects (products) resulting from the implementation of the project reflect indicators at the level of: 1 pcs. — number of supported facilities of vocational training infrastructure, 800 people — potential of the supported infrastructure in the field of childcare or educational infrastructure The total cost of the task is PLN 28 798 283.13, of which ineligible costs PLN 299 728.00.