The planned project under the name “Construction of PV Gutki 2 photovoltaic farm” with a total capacity of up to 6 MWp located on the vol. no. 6, no. 52, Gutki area, Szczuczyn commune, Grajewski district, Podlaskie voivodship will include the construction and operation of a photovoltaic farm, the aim of which is to produce electricity using solar radiation energy and introduce it into the electricity grid. From the level of the PV Gutki 2 photovoltaic power plant — it is a greenfield project, so the project should build the entire power plant from scratch, lay internal wiring, install a transformer, build a connection line, develop accompanying infrastructure such as roads, fence, lighting and provide fiber optic links for the management of the power plant.