The project is located in the city of Mysłowice and concerns the construction of a photovoltaic farm on the premises of the refurbished furnace waste landfill of the Jaworzno III power plant in Mysłowice — Dziećkowice. The project consists of two investment tasks: 1. Construction of a photovoltaic farm The material scope for this task includes the following works and investment facilities: a) installation of photovoltaic panels (94 016 pcs), b) installation of supporting structure, c) installation of inverters with a power of 185 kW (173 pcs.), d) installation of cable lines nN, e) installation of solar wires, f) installation of prefabricated transformer stations with nN/SN transformer (14 pcs), g) installation of fence with gate and gate, h) construction of paved maneuvering sites around transformer stations and access road to power plant, and) construction of cable connections SN, j) exit to plot No 1883/67.