The planned project under the name “Construction of PV Gutki’s photovoltaic farm” with a total capacity of up to 6 MWp located on the vol. no. 6, no. 52, Gutki area, Szczuczyn commune, Grajewski district, Podlaskie voivodeship will include the implementation and operation of a photovoltaic farm, the aim of which is to produce electricity using solar radiation energy and to introduce it into the electricity grid. From the level of PV Gutki’s photovoltaic power plant — it is a greenfield project, so the project should build the entire power plant from scratch, lay internal wiring, install a transformer, build a connection line, develop accompanying infrastructure such as roads, fence, lighting and provide fiber optic links for the management of the power plant.