The investment consists of the implementation of 19.5 km of cycling links in the municipalities of Krško and Kostanjevica na Krki, of which there are sections 1 to 17 (13.5 km) in the municipality of Krško and sections 18 to 21 (5.1 km) in the municipality of Kostanjevica na Krki. It is about: The construction of 9.7 km of separate one-way two-way cycle paths with all the necessary equipment and arrangements? arrangement of 2.4 km of cycling connections on existing carriageways (floor markings “Sharrow”)? Arrangement of 5.5 km of bicycle lanes on the roadway? Arranging 1.4 km of cycling trails, and building 0.50 km of multi-purpose trails, which will also be intended for cyclists.