THE PROJECT FORESEES THE REALISATION OF THE NEW CELL 3 FOR GAS TURBINE FUEL TESTS WITHIN THE SIXTH LAB.THE ACTIVITY? DOES THE CONSTRUCTION SITE CONSIST OF THE CONSTRUCTION OF A NEW BUILDING WITHIN WHICH SAR? PLACED AN EXPERIMENTAL MACHINE, FUELLED WITH LPG FUEL. THE SAR BUILDING? BUILT WITH FIRE-RESISTANT STRUCTURES. THE SAR ARTIFACT? BUILT IN THE SQUARE OF THE SIXTH LAB FACTORY, ADJACENT TO THE EXISTING BUILDING AND AVR? A TOTAL GROSS VOLUME OF 850 MC CIRCAINDICATIVELY WILL BE REALISED THE FOLLOWING WORKS 1. REALISATION OF CIVIL WORKS 2. CONSTRUCTION OF NEW TECHNICAL AND FUEL GAS PIPELINES. 3. REALISATION OF THE NEW CABLE ROUTES FOR ALL THE POWER SUPPLY OF THE CELL (NORMAL AND UPS), FOR THE SUPPLY OF HEATING RESISTORS. 4. REALISATION OF THE NEW CABLE ROUTES FOR ALL SECONDARY POWER SUPPLIES AND SEGNALE5. SUPPLY OF SWITCHBOARDS 6. SUPPLY OF ALL APPARA