Start date: 16 October 2017
End date: 14 October 2020
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 8 900 244,10 €
EU contribution: 7 921 217,25 € (89%)
programme
Programming period: 2014-2021
Managing authority: Nemzetgazdasági Minisztérium, Regionális Fejlesztési Programok Irányító Hatósága

Transport development in Fejér County II.

As part of the project, a section of the secondary road network will be refurbished for a total length of 30.930 km. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road sections will be refurbished as necessary. Sections affected by road refurbishment: — 6219 j. Dunaújváros-Sárbogárd connecting road (3+ 084-10+ 587 kms), intervention length: 7 503 m, municipality concerned: Nagyvenyim, Mezőfalva — 6219 j. Dunaújváros-Sárbogárd connecting road (10+ 587-25+ 179 kms), intervention length: 14 592 m, municipality concerned: Mezőfalva, Sárszentmiklós — 6231 j. Paks-Cece connecting road (19+ 565-28+ 428 kms), intervention length: 8 835 m, municipality concerned: It’s Cece. If the project is implemented, the availability of local and regional jobs will be improved, thereby encouraging labour mobility and economic development. The investment(s) are carried out on the public road network. In fact, the properties concerned and their ownership can only be determined during the planning process. The project concerns road transport in 1988. I. tv. Shall be planned in accordance with Section 8(1a) taking into account the needs of all operators concerned. The investment contributes to the improvement of road safety and the road safety aspects will be and will be given special attention in the planning and implementation process. The list of road sections to be refurbished has been agreed and approved with the county government. Due to the organisation of the Applicant and its expert and institutional background, the financial sustainability of the project and the long-term (5 years) operation and maintenance of the implemented activity are ensured. The technical content of the project will be designed and designed to improve the safety of pedestrians, cyclists and, above all, children, the elderly and people with disabilities. The investment is planned and implemented in a cost-effective manner with a realistic and economical budget. The investment is carried out through a direct or indirect link to economic development and employment and facilitates the infrastructure conditions for labour mobility. The road sections to be refurbished concern 4 settlements. As set out in point 3.4.1.1/7 of the call, a road safety audit will be carried out for the relevant road sections, the recommendations and findings of which will be taken into account when drawing up the plans. The road section planned for refurbishment complies with measure 12.5 of the Fejér County Regional Development Concept: Improvement of the network status of the side road, construction of missing elements. The project is part of the Fejér County Integrated Regional Development Programme (pages 240-242). The project has no foreseeable climate risk. If construction plans and bus bays are foreseen (in the preparation phase of the project, completed), the relevant declaration of intent will be submitted. If the construction of the construction plans and parking spaces is planned (in the preparation phase of the project) the possibility of installing the basic charging infrastructure necessary for the use of electric vehicles will be examined on the basis of point 3.4.1.1/15 of the call. The principles of universal design, i.e. the needs of women and men, the needs of the elderly, the disabled and children, will be taken into account in its design. OF 290/2014. (XI. 26.) The development of the 6231 j. road will be carried out in the district of Sárbogárdi, which is to be developed with a complex programme in accordance with Government Decree No 2631. The development contributes to improving the spatial mobility of the workforce, because the transport connections of the district of Sárbogárdi and Dunaújváros, to be developed with the complex programme, are improving. In addition, Article 105/2015 (IV. 23) the transport connections of the town of Cece, which is provisionally beneficiary, will be improved towards Paks in accordance with Government Decree No 23/2001. All road sections of the investment were also used by public transport. The technical parameters for the renovation of actively used bus bays and runway stops are in consultation with the KNYKK. The impact of development on the region is complex and indirectly improves the approach to the following supported projects: Top-1.4.1-15-FE1-2016-00033 — Creation of a group room in Cece, TOP-1.4.1-15-FE1-2016-00040 — extension and renovation of the kindergarten building in Mezőfalva. The investment is linked to a complex development and improves the approach needed for the expansion of the Paks nuclear power plant. Addendum: The project complies with all environmental and equal opportunities legisla...

Flag of Hungary  Fejér, Hungary