project info
Start date: 4 April 2017
End date: 15 March 2021
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 11 440 862,22 €
EU contribution: 10 182 367,37 € (89%)
programme
Programming period: 2014-2020
Managing authority: Nemzetgazdasági Minisztérium, Regionális Fejlesztési Programok Irányító Hatósága

Transport development in Bács-Kiskun county I.

As part of the project, an additional road section will be refurbished for a total length of 31.557 km. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road sections will be refurbished as necessary. Refurbished sections: 5211 j. road (0+ 600-4+ 200 kms) intervention length: 3.600 km of municipalities concerned: Lajosmizse 5312 j. path (18+ 360-20+ 411 kms) intervention length: 2.051 km 5301 j. (i.e. 25+ 234-30+ 000 kms) intervention length: 4.766 km of the municipality concerned: Páhi 5414 j. road (9+ 780-11+ 744 kms) intervention length: 1.964 km of the municipality concerned: Borota 5407 j. road (25+ 575-26+ 760 kms) intervention length: 1.185 km of the municipality concerned: Jászszentlászló 51145 j. access road (4+ 500-7+ 570 kms) intervention length: 3.070 km 53121 access road (0+ 000-1+ 370 km) intervention length: 1.370 km of the municipality concerned: Harta 54117 access road (6+ 277-8+ 279 kms) intervention length: 2.002 km of municipalities concerned: Very 5501 j. fist (50+ 933-52+ 100 kms) intervention length: 1.167 km of the municipality concerned: Bácsbokod 52121 access road (0+ 000-1+ 878 kms) intervention length: 1.878 km of the municipality concerned: Tass 51341 access road (0+ 000-0+ 200 kms) action length: 0.200 km of affected municipalities: Tass 5205 j. path (39+ 325-40+ 411 kms) intervention length: 1.086 km of the municipality concerned: Tass 5205 j. path (38+ 375-39+ 325 kms) intervention length: 0.950 km of the municipality concerned: Tass 5203 j. path (21+ 049-22+ 170 kms) intervention length: 1.121 km of affected municipalities: Kunszentmiklós 5203 j. road (16+ 1004-21+ 049 kms) intervention length: 4.045 km 53118 access road (0+ 000-1+ 102 km) action length: 1.102 km of the municipality concerned: Dusnok The project aims at the renovation and development of 4-5 digit roads with degraded conditions, which will improve the availability of localities and jobs in the region, thereby encouraging labour mobility and economic development. Investments are made on the public road network. In fact, the properties concerned and their ownership can only be determined during the planning process. The project concerns road transport in 1988. I. tv. Shall be planned in accordance with Section 8(1a) taking into account the needs of all operators concerned. In the case of road sections within a residential area, the possibility of safely driving cycling traffic will be examined. The investment contributes to the improvement of road safety and the road safety aspects will be and will be given special attention in the planning and implementation process. The investment is part of the Bács — Kiskun County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. Due to the organisation of the Applicant and its expert and institutional background, the financial sustainability of the project and the long-term (5 years) operation and maintenance of the implemented activity are ensured. The technical content of the project will be designed and designed to improve the safety of pedestrians, cyclists and, above all, children, the elderly and people with disabilities. The investment is planned and implemented in a cost-effective manner, with a realistic and economical budget. The investment is carried out through a direct or indirect link to economic development and employment and facilitates the infrastructure conditions for labour mobility. The road section to be refurbished concerns 10 settlements. The ‘Indicative allocation for Homokhátság and the Free Entrepreneurship Zone’ from the total envelope available under the area-specific annex of Bács — Kiskun County, TOP-1.3.1-15 for economic development and promoting labour mobility, will be used for the following road sections, the amount of which exceeds the indicative envelope of HUF 1 500 million in the call: Lajosmizse 5211 — Kunszentmiklós connecting road between sections 0+ 600-4+ 200 km section 5312 Kalocsa — Bácsalmás connecting road between sections 18+ 360-20+ 411 km 5301 Kecskemét — Kalocsa connecting road 25+ 234-30+ 000 km section Jánhalma 5414 — Borota road between sections 9+ 780-11+ 744 km road 5407 Bugac intersection 25++ section 575-26+ 760 km between sections 54117 Rém access road 6+ 277-8+ 279 km section 521 Tassi access road 0+ 000-1+ 878 km section 51341 route to Tassi ship station 0+ 000-0+ 200 km section 5205 — Tass connecting road 39+ 325-40+ 411 km section 5205 Örkény — Tass intersection 38+ 375

Flag of Hungary  Bács-Kiskun, Hungary