Start date: 15 May 2016
End date: 1 May 2022
funding
Fund: n/a
Total budget: 51 582 157,32 €
EU contribution: 34 596 152,92 € (67,07%)
programme
Programming period: 2014-2020
Managing authority: Nemzeti Fejlesztési Minisztérium, Környezetvédelmi és Energiahatékonysági Programokért Felelős Helyettes Államtitkárság

Central Danube Water Management System

The system to be developed was based on the collection of double containers in accordance with the legal requirements. In most of the area, the recoverable materials to be separately collected are still collected in a bag system, and new 120 litres EN 840-1 containers will be purchased as part of the development. Complex sorting works are set up in the settlements of Székesfehérvár, Adony for the treatment of collected wastes. Within the sorting plants, the waste collected in the selective container is sorted manually and the residual waste is shredded (RDF production). Depending on the analysis of the quantities of waste, only a transfer station or, in justified cases, a complex sorting plant will be set up in Oroszlány. The planned hall buildings are steel, light-structured, unheated, with the necessary technical fittings, with the necessary technical fittings, with a smoothed industrial floor, with a clear ceiling height of cca.9.0 m. For the proper operation of the treatment plants, storage colours closed and covered from three sides to ensure the placement of finished products (bald secondary raw materials) are necessary, and the space-concrete surfaces providing traffic and manipulation areas around the hall are necessary. For the proper operation of the planned mechanical pre-treatment works, it is necessary to purchase machinery and lorries performing loading and transport tasks.

Flag of Hungary  Fejér, Hungary