In the framework of the investment, the conditions for the proper treatment of the waste water disposal agglomerations with more than 2 000 population equivalent loads are met in order to ensure the coverage of the sewage utility closes to almost 100 % of the public drinking water consumers. The professional expectation of the project is that Hungary will comply with the requirements of EU law by the deadline set. The investment involves the construction of inter-municipal transport lines and the development of the waste water treatment system in the Zsámbéki Basin. As part of the project, the new Zsámbék-centred wastewater agglomeration, the construction of a new waste water treatment plant (ÚT) in Zsámbékon, and the construction of transmission lines (SZ) will be established. The amount of sewerage reconstruction to be declared does not exceed 5 % of the eligible costs.