The improvement of water quality will be achieved through the development of new cleaning technology in the existing local waterworks, which should be expanded: technological upgrading, local application of iron demanganisation and ammonia decontamination technology, as well as the development of safety sodium hypochlorite post-infection technology, clean water reservoir and pressure pump. The demand for raw water in the waterworks can be ensured by the existing and low water supply well, as well as by the equipment of a newly built well and water abstraction pump with a side-drilling capacity. As a result of the expansion of the waterworks building and the construction of the new water well, the clean water basin and the network pumps attached to it, it is also necessary to expand the existing waterworks area. The large renovation of the existing water tower with a counterprinting system shall be carried out as part of the modernisation. The planned reconstruction does not exceed 20 % of the total eligible costs.