The purpose of this preparatory project is to continue the preparatory work already started and to successfully complete the planning and authorisation tasks preceding and enabling the construction works. In summary, these are the following tasks: 1 Full Health Check required for planning work. 2 Completion of all necessary authorisation plans for implementation and successful completion of all necessary authorisation procedures for the selected version of the feasibility study by obtaining final permits. 3 Preparation of packages of tender plans at export level that are more detailed than a licensing plan for certain disciplines. Preparation of 4 land acquisitions. 5 NoBo intermediate certification for completed designs. 6 unpriced and priced designer cost estimates with detailed size and quantity statements. 7 Revision and updating of the feasibility study carried out in 2015 on the basis of the requirements of the IKOP criteria: O addendums and amendments to the EU Climate Change Assessment (CCA) and the CBA Guide on IKOP. O Content revision, clarification, including updating of the technical content and justification of the technical content, in accordance with the requirements and content requirements set out by the IKOP, on the basis of the completed authorisation and tender plans.