Start date: 30 July 2018
End date: 31 January 2022
funding
Fund: n/a
Total budget: 9 715 249,59 €
EU contribution: 4 809 048,54 € (49,5%)
programme
Programming period: 2014-2021
Managing authority: Finansų ministerija
intervention field

Reconstruction of taxiway F, including its distribution and extension

During the implementation of the project, it is planned to reconstruct the existing taxiway F — to reconstruct the existing taxiway cover, to carry out the distribution of the taxiway, to install its extension, surface sewage networks, drainage, signalling and axial LED light systems. Reconstructing and extending taxiway F will bring the following benefits: 1. The safety of manoeuvrability of aircraft is ensured: the introduction of an alternative taxiway will reduce the number of complex manoeuvres required by the aircraft to reach the parking position on the platform from the take-off/landing runway; taxi time of landing/take-off aircraft will be reduced and aircraft are currently operating on an aerodrome apron where the speed of movement is lower than the newly built taxiway; increased traffic safety at the aerodrome due to the refurbished lights system. 2. The reduction in air and noise pollution due to shorter taxi time will reduce noise emissions from aircraft engines, while reducing aircraft fuel consumption and emissions into the environment. 3. Improved passenger experience for safer and shorter aircraft manoeuvring to take off or reach the terminal.

Flag of Lithuania  Lithuania