project info
Start date: 3 June 2019
End date: 31 May 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 15 044 622,82 €
EU contribution: 11 081 727,00 € (73,66%)
programme
Programming period: 2014-2021
Managing authority: Finansų ministerija
intervention field

Installation of viaduct over the railway Mažeikiai m. Algirdo str.

The project “Installation of the airline over the railway in Mažeikiai m. Algirdo g.” is implemented by the Lithuanian Road Administration together with partners Mažeikiai District Municipality Administration and AB Lietuvos geležinkeliai._x000D_Mazeikiai city is divided into two parts, between which two level level crossings ensure the possibility of transport. The main problem with the transport of Mažeikiai is a single level railway crossing located in the western part of the city and connecting the industrial and residential parts of the city. High level-crossing traffic and high train traffic on average cause a disruption of urban connectivity around 2 hours a day. Similarly, pedestrians, like cars, do not have access to safe and uninterrupted crossing of railway tracks. The project “Installation of the airline over the railway in Mažeikiai m. Algirdo g.” provides for the installation of an overpass over the railway Algirdo str. by adapting it to safe pedestrian traffic, to reconstruct the intersection of Algirdas and Factory streets to the circular and the reconstruction of Algirdas and West streets to the traffic lights.

Flag of Lithuania  Vilnius County, Lithuania