The aim of the project is to increase the availability of water supply and wastewater management services and the efficiency of the system. Specific objectives are foreseen for the achievement of the objective: 1. new construction of drinking water supply networks; 2. new construction of waste water collection networks. During the project, about 16 km of new water supply and about 17 km of waste water collection networks are planned to be built, allowing 407 dwellings to be connected to the newly built water supply and wastewater collection networks (pop. 1221).