The object of this operation is Line 1 of the Train for the Bay of Cadiz. Total length: 23.5 Km (13,5 Km of new construction and just over 10 km of use of the general roads of the FFCC Sevilla-Cádiz)._x000D_ — Starts in the town of Chiclana (7 stops). Then, parallel to the A-48, he arrives in San Fernando (having made an interurban stop at the IP Three Ways). In San Fernando 8 stops._x000D_ — After the city centre of San Fernando, it enters the current ADIF roads taking advantage of its infrastructure (4 underground stops in Cadiz)._x000D_ — End of Line: station in Plaza de Sevilla._x000D_ The penetration of this line will be of great relevance connecting the center of Cadiz with Chiclana and San Fernando.