The strategic objective of the project is to increase the connectivity and mobility of the area through an increased volume of passengers who will transit the airport. In order to achieve this objective, the following technical objectives of the project have been established: compliance with the requirements of Regulation 139/2014 by rebuilding the runway surfaces, construction of berths and anti-breathing platforms; compliance with safety and security requirements by building RESA areas, berthings and perimeter roads; —increase of technical parameters of movement areas at airport level; —modernisation of the installation systems necessary for the operation of the movement areas, namely the introduction of the ICAO CAT II beacon system; — compliance of the drainage system with ICAO SARPS/EASA requirements