The project is part of the investment Section PARC Bazilescu – Straulesti, section attributed to Metro Line 4, which was included in the investment: Extensions to the Metro Network, Section I Salajan – LINIA DE CENTURA and Section II GARA DE NORD – BASARAB – LAROMET", approved by GD no 598/08.06.2011. The Project is referred to the execution and commissioning of the extension of Metro Line 4, facilitating the connection between District 1 Bucurestii Noi, Parc Bazilescu (PS Zarea) – Straulesti area and the center of the city, by 2017. The new built metro line within the project will have a length of 1.89 km and two metro stations, Laminorului metro station and Straulesti metro station. The main objective of the project is to facilitate the connection between District 1 Bucurestii Noi, Parc Bazilescu (PS Zarea) – Straulesti area and the center of the city and also the extension of the existent metro network, by the means of a new metro line which will have a length of 1.89 km and 2 metro stations. The result indicators which will be achieved by the end of the project, are as follows: — Number of new metro stations = 2 stations – Total length of the Commissioned route = 1.89 km The expected contribution to achieving the major project under the specific objectives of the relevant priority axis of the operational programme is shown below: The weight of the metro transport mode in the Bucharest public transport: — 38 % of the daily transported passengers The Project Metro Line 4: Extension 2. Section Parc Bazilescu (PS Zarea) – Straulesti is a project which will be completed by commissioning of the underground public transport system. The project represents the final phase – commissioning of Extension 2 of Bucharest Metro Line 4. After both phases are completed, the entire project shall meet the general objectives of the programme – Priority Axis 1 (P.A.) Improving mobility through the development of the TEN-T network and metro system.