The operation is characterised by three types of work:a) Construction of collectors and interceptors. b) Construction of lifting facilities, accessible to people with reduced mobility, equipped with photovoltaic panels to assist in the operation of the equipment. C) Construction of crossings in the Man River to carry out the delivery in the effluent in the emissary Cávado/Man.