The implementation of these infrastructures will make it possible to increase the population served by the domestic waste water network (+ 835 inhabitants), as well as an increase in the number of housings (+ 442) to be used by the domestic waste water network, with a view to optimising the installed capacity and joining the service, the investment of which is in the implementation of the networks and connection to the high subsystem – North/Coimbrão sewage plant.