The operation will have an estimated total cost of EUR 3852476 and aims at the construction of the drainage network of Vale da Champion, the only missing link for the closure of the SAR Vila Real, contributing to the optimisation of the infrastructure already built on the “upstream” side. The operation will also make it possible to improve the quality of the water bodies of Vale da Champion, which is one of the headwaters of Corgo, recently considered a sensitive area.