The project concerns the upgrading of Arta Municipal Swimming Pool, which includes an enclosed building with a total surface area of about 1.714 sq.m. and 2 swimming pools measuring 25 m*50 m the large and 12.5 m*10 m the small one.The project includes 2 sub-projects. Subproject 1 concerns interventions for the replacement of frames, air conditioning, boiler, lamps and installation of a heat pump, solar thermal systems and an energy management system. The aim is to upgrade the Swimming Pool to a higher energy class. Subproject 2 concerns energy advisor services to complete a second energy inspection. The aim of the project is the operation of Arta Swimming Pool throughout the year, as at this stage this is deterrent due to the extremely high cost of fuel consumption for its operation.